通道及施工電梯防護(hù)棚要求要求

來(lái)源:http://www.xalianjia.com/   發(fā)布時(shí)間:2021-11-18

1塔吊半徑以內(nèi)所有后臺(tái)制作加工、攪拌區(qū)必須搭設(shè)雙層防護(hù)棚。

1. All backstage fabrication, processing and mixing areas within the radius of tower crane must be provided with double-layer safety protection sheds.
2.操作場(chǎng)所掛設(shè)的標(biāo)志牌有:機(jī)械驗(yàn)收合格牌、警示牌、操作規(guī)程。標(biāo)牌 的掛設(shè)高度為離地面 2.6 m標(biāo)志牌規(guī)格為寬600mm*高800mm.
2. The signboards hung at the operation site include: Qualified Mechanical acceptance board, safety warning board and operation procedures. The hanging height of the sign is 2.6 m above the ground, and the specification of the sign is 600mm wide * 800mm high
3.地面必須進(jìn)行砼硬化厚200mm,設(shè)置4L滅火器 2 只。開(kāi)關(guān)箱與機(jī)械的水平 間距不得大于 3 m。
3. The ground must be hardened with concrete thickness of 200mm, and 2 4L fire extinguishers shall be set. The horizontal distance between the switch box and the machinery shall not be greater than 3 m.
4.雙層防護(hù)棚,兩層之間高度800mm,面層用噴繪布噴繪制成,正面為防護(hù) 棚名稱和標(biāo)志牌,其余三面采 用警示標(biāo)語(yǔ)。
4. The double-layer protective shed has a height of 800mm between the two layers. The surface layer is made of spray-painted cloth. The front side is the name of the protective shed and safety signs, and the other three sides are provided with safety warning slogans.
木工加工棚
5.加工棚名稱及標(biāo)語(yǔ)字高為400mm,長(zhǎng)度根據(jù)尺寸現(xiàn)場(chǎng)均勻布置。
5. The name of the processing shed and the safety slogan are 400mm high, and the length is evenly arranged on site according to the size.
6.標(biāo)志牌:寬 400mm*高500mm
6. Safety signboard: 400mm wide * 500mm high
7.基礎(chǔ)施工前應(yīng)先視現(xiàn)場(chǎng)地質(zhì)情況做地基處理,處理方法可采用夯實(shí)、換填石 料等,必須保證其密實(shí)度
7. Before foundation construction, foundation treatment shall be carried out according to the site geological conditions. The treatment methods can be tamping, replacement of stones, etc., and its compactness must be ensured
8.立桿采用22#工字鋼立柱刷紅色油漆,每榀寬度5m,高3m。如施工現(xiàn)場(chǎng)場(chǎng)地不足,可以按5m每榀自行調(diào)整做法,但須經(jīng)現(xiàn)場(chǎng)技術(shù)人員同意。
8. The vertical pole adopts 22# I-steel, and the column is painted with red paint. Each frame is 5m wide and 3M high. If the construction site is insufficient, the method can be adjusted according to 5M each frame, but it must be approved by the on-site technicians.
9.圖中標(biāo)注為焊接的地方如無(wú)特殊說(shuō)明的,均作滿焊處理 ,現(xiàn)場(chǎng)安裝前應(yīng)對(duì)各 構(gòu)件焊接質(zhì)量進(jìn)行驗(yàn)收
9. The places marked as welding in the drawing shall be fully welded unless otherwise specified. The welding quality of each component shall be accepted before on-site installation
10.鋼筋加工機(jī)具應(yīng)獨(dú)立配置開(kāi)關(guān)箱,開(kāi)關(guān)箱中心離地面高度為1.5m. 11.軟弱基礎(chǔ)及受臺(tái)風(fēng)影響地區(qū)須增設(shè)拉錨。
10. Rebar processing machines and tools shall be equipped with switch box independently, and the height from the center of the switch box to the ground shall be 1.5m. 11. Pull anchors shall be added in weak foundation and typhoon affected areas.

七星彩最近开奖号码| 国产猛男GAY1069视频| 又嫩又硬又黄又爽的视频| 婷婷色啪啪色窝窝一区| 姐姐不可以免费动漫在线观看| 新金瓶悔1一5集免费大片| 一本色道久久综合无码人妻| 大陆农村妇女老BBWBBW| 又色又爽又黄又免费网站| 国产69精品久久久久777| 久久无码人妻丰满熟妇区毛片| 公的粗大挺进了我的密道| 国模少妇一区二区三区| 人妻少妇一区二区三区| 嫩草伊人久久精品少妇AV网站| 小少爷撅着屁股挨C双龙若| 亚洲人成在线观看| 天天爱天天做天天爽| 激情欧美日韩一区二区| 在熟睡夫面前侵犯我在线播放| 宝宝好涨水快流出来免费视频| 欧美精品在线观看| 人妻激情偷乱视频一区二区三区| 亚洲码欧美码一区二区三区| 成人AV在线观看| 国精产品WNW| 曰本女人与公GUO交酡视频A片| 国产成人一区二区三区影| 中文字幕人妻丝袜乱一区三区| 免费观看性生交大片| 被男人嗦过奶头一下就变大了| 成人国产片女人爽到高潮网站| 精品国产AV一区二区三区| 精品一区二区三区在线视频| 成全视频在线观看免费| 公车上雪柔被猛烈进出| А_天堂中文最新版地址| 学生娇小嫩白紧小疼叫| 成年女性和成年男性BMI| 欧美《熟妇的荡欲》未删减版| 色窝窝无码一区二区三区成人网站|